Some investments in the range of special work:

  • The Ski Slope in Przemyśl - building works
  • Landing field strip for helicopters for the Border Guard in Huwniki - building works
  • The thermal net in the centre of Rzeszów city - the heat engineering route in Śródmieście
  • Thermal nets at Chopin, Krakowska, Kurpiowska Streets and in ZELMER Rzeszów
  • The dam on the Rudnik River - reconstruction works
  • The reconstruction of the worn out by flood water reservoir "Krasna" in Stąporków
  • The threshold piling up on the river for EC Rzeszów
  • Artificial snowing installation on Dziadowa Mountain in Bystre near Baligrod

 

Some investments in the range of special work realized by Inżynieria Rzeszów Ltd:

 

  • The terminal infrastructure in the Rzeszów Air Harbour in Jasionka

 

Below some of the investments realized in the last time:

 



The Ski Slope in Przemyśl - building works

The range of investment:

 

Development, architecture, construction works (the M2 bridge, resistory walls seated on pales, enclosures and field barriers, secured works over streets, underground infrastructure).

 

The period of the investment's realization: 15.03.2005 - 16.12.2005

 

The value of the reward for the object of order:

 

11 057 701,29 PLN (net)

13 490 395,57 PLN (gross)

 

The investment was realized in a very hard working conditions (slip terrain). During the realization of the task four geotechnical records there were made which were prepared by independent geologists.

 

The installed railway consists of two parts:

 

The cable car KL-1 about the length in the profile aprox. 305 m, the difference of levels: 38 m and capacity: 1 200 persons per hour.

 

The cable car KL-1 about the length in the profile aprox. 673 m, the difference of levels: 110 m and capacity: 1 800 persons per hour.

 

The investment was realized at the consortium: Inżynieria - Elbud - Intop.